Brampton Engineering is proud to announce the sale of a 9 layer AeroFrost® blown film system to a customer located in Brampton Ontario.
This loyal customer was very pleased with the performance of recently purchased BE water quenched system, now commissioned and in full production, and decided to expand their operation through the addition of a new BE 9 layer blown film system.
Fast job changeovers, requiring less start-up time and product waste minimisation, are a breeze to perform, making the AeroFrost® the best choice for today’s increased demand for shorter jobs.
Congratulations to our customer for their decision to strengthen the long partnership with Brampton Engineering and continue their road to success through innovation with BE.
